
New TopShim run:

version = topshim 2.0.0
date = 2023-10-27
time = 17:06:16.050
command = topshim  convcomp tuneaxyz

1D SHIMMING

Parameters:

maximum order = 5
probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm
optimisation parameters = ls
linewidth 1H = 0.10 Hz
envelope shape / strictness = 2.00 / 200

Results:

tune lock level increase = 1.2

initial B0 stdDev = 6.02 Hz
sample size = 2.58 cm, position = 0.14 cm
final B0 stdDev = 1.49 Hz > improvement = 4.0
envelope width = 3.73 Hz

Performing tune after shimming
tune lock level increase = 1.1

shim changes: 
Z	+124
Z2	-74
Z3	+106
Z4	-344
Z5	+462
X	-57
Y	+156

duration = 3 min 54 sec
completed successfully
finished Fri Oct 27 17:10:08 2023


========================================================================
